Installation; Site Requirements; Transport - GE HEALTHCARE AKTAprime plus Operating Instructions Manual

Compact liquid chromatography system designed for one-step purification of proteins at laboratory scale
Hide thumbs Also See for AKTAprime plus:
Table of Contents

Advertisement

3

Installation

ÄKTAprime plus is delivered in protective packing material and shall be unpacked with
great care.
Any equipment connected to ÄKTAprime plus must fulfill applicable standards and local
regulations.
A video describing the installation process, is supplied with each ÄKTAprime plus system.
For detailed information on Installation, see ÄKTAprime plus User Manual.
3.1

Site requirements

Parameter
Operation site
Altitude
Placement
Electrical power
Transient overvoltages
Ambient temperature
Humidity
Atmospheric pressure
Pollution degree
3.2

Transport

The equipment can be transported on a trolley capable of supporting at least 20 kg.
ÄKTAprime plus Operating Instructions 28-9597-89 AC
Requirement
Indoor use
Maximum 2000 m
Stable laboratory bench e.g. 120 × 80 cm
100-120/220-240 V AC ±10%, 50-60 Hz
Overvoltage category II
4°C to 40°C
20% to 95%, non-condensing
84 to 106 kPa (840 to 1060 mbar)
2
WARNING
Do not block the ventilation inlets or outlets on the system.
3 Installation
29

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents