The Assisted Project Setup Screen; Data Acquisition With The New Project Function - Leica DS2000 User Manual

Table of Contents

Advertisement

4.3.2
Elements of the
Assisted Project
Setup screen
4.3.3
Starting an acquisi-
tion
Leica DM2000, Software

The Assisted Project Setup Screen

a
b
c
d
012390_001
a) Layers section
b) Map section
c) Reference Line section
d) Grid section

Data Acquisition with the New Project Function

1.
Click the New Project button in the main menu.
The software starts calibrating the radar. A dialogue box shows the progress
of the calibration.
If the radar calibration fails, the following dialogue box is displayed.
Ensure that the Ethernet cable is connected properly to the laptop/tablet and
that the control unit is turned on.
If one of the radar channels does not work, an error screen indicates the faulty
channel.
2.
As soon as the radar calibration is complete, the Acquisition screen is
displayed.
Use the acquisition commands to start and stop the acquisition of scan data.
For a detailed description of these and other available functions, refer to
"4.3.1 The Acquisition Screen".
The length of a single scan must not exceed 800 m.
28

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents