Assembly - Grizzly G0763 Owner's Manual

6" x 18" surface grinder w/2-axis power feed
Table of Contents

Advertisement

10. With help from another person to steady the
load, lift machine enough to remove pallet.
11. With machine still suspended above floor,
thread leveling pad bolts, as illustrated in
Figure 14, into holes used to bolt machine to
pallet.
Note: Make sure flat washer and hex nut
are above machine base and bottom of bolt
extends approximately
base.
Threaded
Hole
Leveling
Pad
Figure 14. Leveling pad and bolt installed.
12. Position leveling pads underneath bolts and
lower machine so the bolts rest in center of
pads.
For accurate results and to prevent warping
the cast iron ways, the table MUST be level
from side to side and from front to back.
Recheck the ways 24 hours after installation,
two weeks after that, and then annually to
make sure they remain level.
13. Using a precision level on unpainted table
surface without magnetic chuck, adjust level-
ing pad bolts until table is level from side to
side and front to back.
14. When table is properly leveled, tighten down
hex nuts on bolts to secure settings.
15. Reconnect coolant pump electrical cord and
coolant hose.
-18-
" below machine
3
4
Flat Washer
& Nut Above
Machine Base
Approx.
"
3
4

Assembly

To assemble the surface grinder:
1.
Install handles on X- and Z-axis handwheels.
2.
Remove table restraints.
Take care not to damage table or saddle
ways. Any damage to these surfaces will be
permanent and result in poor finishes.
3.
With help from another person, remove table
and place it upside down on a clean, flat sur-
face.
4.
Store plastic shipping rods (see Figure 15) for
future use when storing or moving machine to
protect ways.
Rods
Figure 15. Plastic rods used for shipping or
storage purposes.
5.
Clean the table and saddle ways, and
table ball bearing segments, as directed on
Page 15.
Model G0763 (Mfd. Since 6/15)

Advertisement

Table of Contents
loading

Table of Contents