Commissioning Of The Boiler - Baxi Power HT 1.850 Installation, Operation And Maintenance Manual

Power ht series. floor standing condensing gas boilers
Hide thumbs Also See for Power HT 1.850:
Table of Contents

Advertisement

Available languages

Available languages

IT
To correctly light the burner proceed as follows:
AT
1) provide power supply to the boiler;
2) open the gas cock;
3) follow the directions given below regarding the adjustments to be made at the boiler control panel.
GB
Figure 1
IMPORTANT: Domestic Hot Water (D.H.W.) instructions here discribed, are to take in account only if the
boiler is connected to a D.H.W. production system.
Domestic hot water on/off key
Central heating water temperature setting key
Domestic hot water temperature setting key
Reset key
Program access and scroll keys
Program access and scroll key
Parameter setting key (decrease value)
Parameter setting key (increase value)
Data display reset key
Central heating mode setting key

3. COMMISSIONING OF THE BOILER

KEYS
ISTRUCTIONS PERTAINING TO THE USER
DISPLAY SYMBOLS
Operation in domestic hot water mode
Operation in central heating mode
Operation in automatic mode
Operation in manual mode at the maximum
temperature set
Operation in manual mode at minimum tem-
perature
Standby (off)
Outdoor temperature
Flame present (on)
Resettable alarm warning
MAIN display
SECONDARY display
76

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents