4.9
ExtendAire II
4.10 Record Keeping
Following inspection, the date and initials of the designated inspector should be recorded. A more
detailed record of the operations performed can be noted on an inspection and maintenance log,
available from MSA. When the inspection data has been recorded, the SCBA is ready for functional
tests.
(1)
Inspect the ExtendAire II Manifold. Ensure that all roll pins are
present.
(2)
Inspect Quick-Connect fittings.
(3)
Ensure that the openings are clear and free of debris and other
contaminants.
(4)
Ensure that the Quick-Connect fittings operate properly and are
secured.
G1
Visual Inspections
25
US