Unpacking - Siemens 3AK Operating Instructions Manual

Vacuum circuit-breaker module
Table of Contents

Advertisement

Transport, storage and packing
Transporting with packing
Checking the transport
Working equipment
6
Transport the transport unit to the installation site or storage location
with a fork lift or
with sling gear suspended from a crane
-
at an angle of twist of approx. 60° or
-
with a spreader bar.
After receipt of delivery:
Check transport unit for damage.
unit
Major damage must be documented photographically.
Ensure that any damage to the transport unit is confirmed by the transport com-
pany.

Unpacking

Required tools:
-
Knife/scissors
-
Lifting equipment with lifting gear
-
Pliers or lever.
CAUTION
Risk of injury from sharp edges!
Fasteners may break, leaving sharp edges.
Always use a suitable tool to lever out fasteners.
Note
Do not cut open or damage the carton, since it is designed to be reused and
because of the belt straps located underneath.
Belt straps could be severed on the pallet floor when cutting open the carton.
The vacuum circuit-breaker module is attached to the pallet with belt straps. It is
not possible to transport the vacuum circuit-breaker module on the pallet without
using belt straps (see Fig. 4).
Fig. 2
Removing the carton
9229 9923 176 0B
2013-09-09

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

3ak1

Table of Contents