Table Of Contents - gledhill BOILERMATE CP BMSCP120 Instruction Manual

Mains pressure hot water
Table of Contents

Advertisement

Benchmark places responsibilities on both manufacturers and installers. The purpose is to
ensure that customers are provided with the correct equipment for their needs, that it is
installed, commissioned and serviced in accordance with the manufacturers instructions
by competent persons and that it meets the requirements of the appropriate Building
Regulations. The Benchmark Checklist can be used to demonstrate compliance with
Building Regulations and should be provided to the customer for future reference.
Installers are required to carry out installation, commissioning and servicing work in
accordance with the Benchmark Code of Practice which is available from the Heating
and Hot Water Industry Council who manage and promote the Scheme. Visit www.
centralheating.co.uk for more information.
For further information on the HWA Charter Statement, please refer to the HWA website
hotwater.org.uk.
ISSUE 6: SEPTEMBER 2017
Section
Annual Service
ADDENDIX
Addendix A
Addendix B
Addendix C
The Gledhill BoilerMate CP range is a
WBS listed product and complies with
the HWA Specification for hot water only
thermal storage products. The principle was
developed in conjunction with British Gas.
This product is manufactured under an ISO
9001:2008 Quality System audited by BSI.
Gledhill's first priority is to give a high quality
service to our customers.
Quality is built into every Gledhill product
and we hope you get satisfactory service
from Gledhill.
If not please let us know.
Page 2
Any water distribution system/installation must comply with the relevant
recommendations of the current version of the Regulations and British Standards
listed below:-
Page
Gas Safety (Installation and use) Regulations 1998
Building Regulations
Water Supply (Water Fittings) Regulations 1999
3
Manual Handling Operations Regulations
5
9
British Standards
BS EN 806:1-5: BS EN 8558:2011
Requirements for Electrical Installations BS7671:2008 and A2:2013 17th Edition
13
Most new building work will require the relevant building control body to be notified
14
prior to the building work commencing. This will not be required if the work is carried
20
out under a self certification scheme or if the work is not notifiable. Full details of the
21
self certification schemes and work that is not notifiable can be obtained from page
9 of Approved Document G, available from www.planningportal.gov.uk.
A suitably competent trades person must install the BoilerMate CP and carry out
22
any subsequent maintenance/repairs. In fact the appliance front cover is secured
22
by 2 screws and this should only be removed by a competent trades person. The
23
manufacturer's notes must not be taken as overriding statutory obligations.
24
The Domestic Building Services Compliance Guide 2013 defines, one of the fixed
building services, as any part of or controls associated with fixed systems for domestic
hot water. All fixed building services, including theircontrols, should be commissioned
30
by testing and adjustment to ensure that they use no more fuel and power than is
31
reasonable in the circumstances. Where commissioning is required, if it is completed
by a person registered with a competent person scheme, the commissioning notice
32
will be supplied by that person, otherwise the person carrying out the work must notify
the relevant building control body, that commissioning has taken place in accordance
33
with the Domestic Heating Compliance Guide.The building control body will then be
able to issue a completion certificate. This applies to England, for other jurisdictions in
36
the UK, it may be necessary to consult their own building regulations and guidance.
The BoilerMate CP is not intended for use by persons (including children) with reduced
physical, sensory or mental capabilities, or lack of experience or knowledge, unless
38
they have been given supervision or instruction concerning use of the appliance by
39
a person responsible for their safety.
Children should be supervised to ensure that they do not play with the appliance.
The information in this manual is provided to assist generally in the selection of
equipment. The responsibility for the selection and specification of the equipment
must however remain that of the customer and any Designers or Consultants
concerned with the design and installation.
Please Note: We do not therefore accept any responsibility for matters of design,
selection or specification or for the effectiveness of an installation containing one of
our products unless we have been specifically requested to do so.
All goods are sold subject to our Conditions of Sale, which are set out at the rear of
this manual.
In the interest of continuously improving the BoilerMate CP range, Gledhill Building
Products Ltd reserve the right to modify the product without notice, and in these
circumstances this document, which is accurate at the time of printing, should be
disregarded. It will however be updated as soon as possible after the change has
occurred.
DESIGN
The Environment
This product has been manufactured using
many recyclable materials, including the
approved HCFC/CFC free polyurethane foam
insulation. At the end of its useful life, it
should be disposed of at a Local Authority
Recycling Centre, to maximise the products full
environmental benefits.
INTRODUCTION
Page 3

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents