154
Checking the
electrical system
LS4000, LS4060 DIODE LASER ANALYZERS | OI/LS4000/O2-EN REV. A
Test object
Requirement
Transmitter unit,
The transmitter unit and receiver unit are in the following
receiver unit
condition:
The housings are not damaged
The housing covers are closed and bolted
All of the fixing screws are present.
The transmitter unit and receiver unit are installed so that
the following requirements are met:
The housings do not come into contact with any over-
The housings are not improperly heated by the heat
Test object
Requirement
Cable condition
All cables are undamaged.
Cable types
All connections are made using the specified cable type.
Cable lengths
For ATEX, IECEx and KCs variants: The cables of the
transmitter unit and receiver unit are at least 1.00 m long.
Shielded cables
The shielded cables meet the following requirements:
The cables are fed through metal cable glands
The braided shield is properly connected to the cable
Supply voltage
The supply voltage is consistent with the information on
the name plate of the junction box.
Connecting
All connecting cables meet the following requirements:
cables
The cables are properly installed and secured
The cables in the junction box are connected using the
The cables in the cable glands are sealed so that no
All of the unused cable wire ends are insulated or
If there is a danger of explosion due to dust, precau-
Cable glands
The cables in the cable glands of the transmitter unit
Potential equali-
The following devices are connected via a ground cable to
zation terminal
the local potential equalization terminal:
Transmitter unit
Receiver unit
Junction box
pressure in the process gas path
generated at the contact point of the process gas path
(purging flange).
gland
correct terminal assignment.
dust can penetrate
grounded
tionary measures are taken to prevent the develop-
ment of static charges on the surface of cables and
lines.
and receiver unit are fitted in a fixed position and can-
not move