ABB 650 series Engineering Manual page 113

Hide thumbs Also See for 650 series:
Table of Contents

Advertisement

1MRK 511 261-UEN -
650 series
Engineering Manual
IEC10000172 V1 EN
Figure 75:
Configuring hardware channels directly to the function blocks
IEC10000173 V1 EN
Figure 76:
CMT: Hardware channels appearing in the Communication
Management Tool
2.
Right-click the IED in the plant structure and select Communication
Management to start the Communication management tool.
3.
Select the DNP3 protocol from the new window and click OK.
presents the design of the two container windows, which open after the
selection of DNP3.
The right window shows tabs for possible communication channels.
The left window has a drop down menu for signal selection and buttons
for signal movement, see
DNP3 communication engineering
Figure
77.
Section 9
IEC10000172.vsd
IEC10000173.vsd
Figure 77
107

Advertisement

Table of Contents
loading