61850 IED" is used to integrate these kinds of IEDs in the plant structure
etc.
4.4. Click Ignore PCM Object Type to update the IED object(s) in PCM600
from the IED type(s) in the SCD file, disregarding if the IED type(s) in
the SCD file matches the IED object(s) in PM600 or not.
4.5. Start Import when the file definition has been completed. A progress
window presents the import procedure.
5.
Make connections from sending IEDs to receiving function blocks in SMT.
5.1. Make connections between the signals that the server is sending and all
the GOOSE receive interface function blocks included in the application
configuration on the client's side.
If a client is defined for GOOSE receive then at least one cross
in SMT is required to be able to write the configuration to the
IED.
Be sure to set the setting Operation to On in PST for all
included GOOSE receiving function blocks in the application
configuration to enable GOOSE communication.
6.
Write the configuration to the IED, see
Note that the engineered data is written to the IED when
executing a common Write to IED operation.