Machine Debugging; Sequence Of Power-On And Power-Off - Yueming CMA1325 Owner's Manual

Nestcutting series cutting and engraving laser machine
Table of Contents

Advertisement

Laser output when it lights, users need to attention.

3.3 Machine debugging

After completing installation, machine debugging and processing test are needed. The
machine debugging is mainly to complete status test of each nodule if the machine including
movement module, laser module and electric IO module.

3.3.1 Sequence of power-on and power-off

There is an instruction of sequence of power-on and power-off stuck on the master power
switch.
Sequence of power-on:
Master power supply of the machine→ Water chilling system→ Laser power supply→
Computer→ Other auxiliary parts
Power-off is in the reverse sequence as:
Other auxiliary parts→ Computer→ Laser power supply→ Water chilling system→ Master
power supply of the machine
Insert the power supply (behind the machine) into the electrical outlet, electrify the
electrical outlet, then rotate the total power supply switch by 90°clockwise to power
on the machine as follow:
After the master power supply of machine power on, the control system of machine
will power on automatically, at this moment, you can see the system start interface of
control panel.
Fig.3-21 Indicator light
Rotate it to power on by 90°clockwise,
Rotate it to power off by 90°
counterclockwise
Fig.3-22 Master power supply switch
- 37 -

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Cma1625Cma2222

Table of Contents