FAAC 615 Instruction Manual

FAAC 615 Instruction Manual

Standard automatic barrier
Hide thumbs Also See for 615:

Advertisement

615
615

Advertisement

Table of Contents
loading

Summary of Contents for FAAC 615

  • Page 2 Leggere completamente questo manuale di istruzioni prima di iniziare l’installazione del prodotto. Il simbolo evidenzia le note importanti per la sicurezza delle persone e l’integrità dell’automazione. Il simbolo richiama l’attenzione sulle note riguardanti le caratteristiche od il funzionamento del prodotto. Read this instruction manual to the letter before you begin to install the product.
  • Page 3: Table Of Contents

    INDEX INDEX CE DECLARATION OF CONFORMITY FOR MACHINES ....................2 WARNINGS FOR THE INSTALLER ..........................2 1 DESCRIPTION AND TECHNICAL SPECIFICATIONS ....................3 1.1 MAXIMUM USE CURVE ............................. 3 2 ELECTRIC PREPARATIONS (standard system) ......................4 3 DIMENSIONS ................................4 4 INSTALLING THE AUTOMATED SYSTEM ........................
  • Page 4: Ce Declaration Of Conformity For Machines

    “16”. 6) FAAC declines all liability caused by improper use or use other than that 18) FAAC declines all liability as concerns safety and efficient operation of for which the automated system was intended.
  • Page 5: Description And Technical Specifications

    The curve makes it possible to establish maximum work time (T) according to use frequency (F). E.g. The 615 BPR automated system can operate non-stop at a use frequency of 50%. To ensure efficient operation, operate in the work range under the curve.
  • Page 6: Electric Preparations (Standard System)

    2. ELECTRIC PREPARATIONS (standard system) Operator 615BPR 4.2 MASONRY FOR FOUNDATION PLATE Photocells Key-operated push-button 1) Make a foundation plate as shown in fig.4 (referred to Flashing lamp clayey soil) Receiver 2) Wall the foundation plate as shown in fig.4, supplying fig.2 loop detector one or more sheaths for routing electrical cables.
  • Page 7 IMPORTANT: moderately tighten the pocket securing screw (max 30Nm) fig.5 fig.7b fig.6 IMPORTANT: moderately tighten the pocket securing screw (max 30Nm) fig.8 fig.7a...
  • Page 8: Balancing Springs

    5 BALANCING SPRINGS The 615 BPR automated system requires a balancing spring for the beam, which must be ordered separately. The spring varies according to length and type of beam (rigid, skirt or articulated). Consult the tables below to see if the spring matches.
  • Page 9: Start-Up

    6 START-UP 6.4 AUTOMATED SYSTEM TEST 6.1 ADJUSTING THE TRANSMITTED TORQUE To set the hydraulic system controlling transmitted power, After installation, apply the danger warning sticker on the top turn the two by-pass screws (fig.10). of the upright (Fig. 12). The red screw controls closing movement torque.
  • Page 10: Available Accessories

    15 POSITIONING THE FORK SUPPORT FOUNDATION PLATE 11 REPAIRS For any repairs, contact FAAC’s authorised Repair Centres. Dimensions are in mm. fig. 16 To position the foundation plate of the fork support, refer to fig.16 where:...
  • Page 11 Les descriptions et les illustrations du présent manuel sont fournies à titre indicatif. FAAC se réserve le droit d’apporter à tout moment les modifications qu’elle jugera utiles sur ce produit tout en conservant les caractéristiques essentielles, sans devoir pour autant mettre à...

This manual is also suitable for:

615bpr std615bpr rap

Table of Contents