Step 2: Mounting VTrak in a Rack
The M610i is shown on this page. The M310i and M210i are shown on page 7.
Mounting the VTrak M610i in a Rack
The M610i subsystem installs to the rack using the supplied mounting rails. You
can also use your existing rails.
Figure 5. VTrak M610i mounted in a rack with the supplied rails
Vertical Rack Post
Handles mount
outside the rack post
To install the M610i subsystem into a rack with the supplied mounting rails:
1.
Check the fit of the mounting rails in your rack system. See Figure 6.
2.
Adjust the length of the mounting rails as needed.
•
At least two persons are required to safely lift, place, and
attach the VTrak subsystem into a rack system.
•
Do not lift or move the VTrak subsystem by the handles,
power supplies or the controller units. Hold the subsystem
itself.
•
Do not install the VTrak subsystem into a rack without rails to
support the subsystem.
•
Only a qualified electrician who is familiar with the installation
procedure should mount and install the VTrak subsystem.
•
Be sure all switches are OFF before installing the VTrak
subsystem or exchanging components.
Step 2: Mounting VTrak in a Rack
VTrak M610i
Mounting rails (included)
mount inside the rack post
Cautions
5