ECR International CHB Application Manual page 34

Wall mounted gas boiler
Table of Contents

Advertisement

LWCO Wiring Diagram
Key
16
Modulating fan
32
Heating circulating pump
42
DHW temperature sensor (see kit)
44
Gas valve
47
Modulation Regulator (24V)
72
Room thermostat (field sourced)
81
Ignition/detection electrode
114
Water pressure switch
138
External probe (not fitted)
155
Hot water tank temperature probe (field sourced)
278
Double sensor (Safety + Heating)
297
Air pressure transducer
370
Low Water Cutoff (LWCO) (field sourced)
OPTIONAL EQUIPMENT - LOW WATER CUTOFF
138 - Optional Outdoor Sensor
155 - Optional Indirect Tank Sensor
370 - Field Source LWCO
*IMPORTANT:
Before connecting the room thermostat, remove
jumper on terminal block. (Key 72)
Before connecting optional Indirect Tank Sensor,
remove two resistors, (Key 155)
Before connecting the Low Water Cutoff, remove the
jumper on terminal block. (Key 370)
34
NOTICE

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

CcbChb 150Chb 100Chb 130Ccb 150

Table of Contents