Information before installation
Carton Contents:
1 x Power Pack (control box)
1 x Electrolytic Cell
1 x Owner/Operators Manual
1 x Installation Screw Set
1 x Power Pack Hanging Template
Technical specifications
Power supply voltage
Electric power
Protection index
Control box size (W x L x D)
Weight (box + cell)
EiXpert Installation
Install the cell
(a) Cell MUST be installed horizontally downstream of the heater and filter. It MUST be the last piece of
equipment in the return line to the pool.
(b) The position of the cell, relative to other equipment, should be such that gases generated under normal
operation should not accumulate in any receptacle or pipework. Thus, the cell should be positioned in-line
AFTER all receptacles where gases in excess of 2 litres may accumulate under normal operation. e.g. filter
tanks, header tanks, solar systems, by-pass pipe loops, heaters, etc.
(c) If a valve is required after the cell it should always be a non-return valve not a manually operated version.
220 - 240 Vac-50 Hz
Max. 140 W
IPX3
285 x 405 x 115 mm
Minimum 7.1 kg
Torque = 1.2 N.m (= 12.2 kg.cm)
3