Before Setting Up Your Projector And The Chiller Unit - NEC NC1700L Installation Manual

Dlp cinema projector, chiller unit
Hide thumbs Also See for NC1700L:
Table of Contents

Advertisement

1. Before Setting Up Your Projector and the Chiller Unit

1-1. Clearance for Installing the Projector and the Chiller Unit (English)
Allow ample clearance between the projector and its surroundings as shown below.
Avoid installing the projector in a place where air movement from the HVAC is directed at the projector.
Heated air from the HVAC can be taken in by the projector's intake vent. If this happens, the temperature inside the projector
will rise too high causing the over-temperature protector to automatically turn off the projectors power.
1-1-1. Projector
Example 1 – If there are walls on both sides of the projector.
The drawing shows the proper clearance required for the front, back and top of the projector.
NOTE
Example 2 – If there is a wall behind the projector.
(1) For floor installation:
The drawing shows the proper clearance required for the front, sides and top of the projector.
NOTE
32
30cm/12"
or greater
70cm/27.6"
or greater
50cm/19.7"
or greater
REMOTE
LAN
RS-232
3D
GP I/O
USB
Lens

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Np-17cu01

Table of Contents