Rheem 97MDV060 Series Installation Instructions Manual page 39

(-)97v series upflow condensing modulating, communicating gas furnaces w/ecm blower (-)97v series
Table of Contents

Advertisement

GENERAL VENTING REQUIREMENTS AND
DIRECT VENT (cont.)
OPTIONS 8 & 9: 2 & 3 SIDE WALL VENT TERMINATIONS (Figures 24 & 25)
FOR 2 PIPE: RXGY-G02
FOR 3 PIPE: RXGY-G01
This termination is for horizontal venting only. This termi-
nation may be installed with either a non-direct-vent or a
direct-vent system. When installed as non-direct vent,
only one wall penetration is necessary for the exhaust
IMPORTANT: Do not install on the prevailing winter wind
vent.
IMPORTANT: Maintain a minimum of 12 inches (U.S.)
side of the structure.
above grade or the highest anticipated average snow level
(whichever is greater) to the bottom of the vent cover or, in
Canada, terminations must conform with CSA B149.1-10,
Sect. 8.14, Canadian Natural Gas and Propane Installa-
tion Code.
NOTE: Dimensions between the inlet and outlet pipes (di-
rect-vent only) are fixed by the sidewall termination. Other
drawings in this manual which specify minimum and/or
maximum distances (vertical and horizontal) between
NOTE: Multiventing – NO COMMON VENTING IS PER-
pipes do not apply to the sidewall termination kit.
MITTED WITH THIS KIT.
FIGURE 24
VENT KIT INSTALLATION OPTIONS
MAINTAIN 12"/31cm FOR THE U.S. AS THE
MINIMUM CLEARANCE ABOVE THE HIGHEST
CIPATED SNOW LEVEL OR GRADE WHICHEVER
ATER. IN CANADA TERMINATIONS MUST CONFORM
TO CSA B149.1-10, SECT. 8.14.
ST-A1194-46
3" PIPE
WITH
OPTIONAL
2" TERMINATION
2" PIPE
(RXGY-G02)
OR
3" PIPE
(RXGY-G01)
IS GREATER. IN CANADA TERMINATIONS MUST CONFORM
8"
MIN.
8"
MIN.
NOTE: With this option a trap on the inlet combustion
NOTE: Install the vent and air intake piping into the vent
air pipe is NOT required.
BE SURE TO USE SILICONE SEALANT to seal the vent
plate openings. Seal all gaps between the pipes and wall.
pipe to the vent cap to permit field disassembly for annual
the wall. DO NOT INSTALL VENT KITS ONE ABOVE
inspection and cleaning. Also seal all pipe penetrations in
THE OTHER to prevent the possibility of condensate
NOTE: Vent should protrude a maximum of 2-1/4 inches
freeze-up or recirculation.
beyond the vent plate. Air intake should protrude a maxi-
mum of 1 inch beyond the vent plate.
NOTE: The RXGY-G02 termination can be used with 3"
vent pipe. A maximum of 18" of 2"
fore penetrating the wall.
Complete installation instructions are included with these
MAINTAIN 12"/31cm FOR THE U.S. AS THE
MINIMUM CLEARANCE ABOVE THE HIGHEST
kits.
ANTICIPATED SNOW LEVEL OR GRADE WHICHEVER
TO CSA B149.1-10, SECT. 8.14.
FIGURE 25
TYPICAL INSTALLATION – DIRECT VENT
3" PIPE
WITH
OPTIONAL
2" TERMINATION
2" PIPE
(RXGY-G02)
OR
3" PIPE
(RXGY-G01)
ST-A1194-46
GUIDELINES
pipe can be used be-
8"
MIN.
MAINTAIN 12"/31cm FOR THE U.S. AS THE
MINIMUM CLEARANCE ABOVE THE HIGHEST
ANTICIPATED SNOW LEVEL OR GRADE WHICHEVER
IS GREATER. IN CANADA TERMINATIONS MUST CONFORM
TO CSA B149.1-10, SECT. 8.14.
8"
MIN.
8"
MIN.
39

Advertisement

Table of Contents
loading

Table of Contents