Rheem 97MDV060 Series Installation Instructions Manual page 16

(-)97v series upflow condensing modulating, communicating gas furnaces w/ecm blower (-)97v series
Table of Contents

Advertisement

Checklist:
__
VERIFY ALL HOSES ARE SECURE AND FULLY SEATED.
__
CONFIRM THAT ALL HOSES ARE FREE OF KINKS.
__
CONFIRM ALL HOSES AND OTHER DRAIN PARTS HAVE A
SLOPE IN DIRECTION OF WATER FLOW
__
BOTH WORM DRIVES ON THE HOSE CLAMPS OF THE IDB COUPLING
MUST BE LOCATED ON THE TOP OF THE COUPLING. SEE LOCATION
DETAIL IN THE GENERAL CONVERSION INSTRUCTIONS AT THE
BEGINNING OF THIS SECTION.
__
ALL CLAMPS AND COUPLINGS ARE TIGHTENED
__
ALL DRAIN PORTS ARE PLUGGED
__
UNIT HAS FORWARD PITCH
__
HEAT TAPE INSTALLED (IF REQUIRED)
Notes:
16
ST-A1194-68-00

Advertisement

Table of Contents
loading

Table of Contents