Rheem 97MDV060 Series Installation Instructions Manual page 15

(-)97v series upflow condensing modulating, communicating gas furnaces w/ecm blower (-)97v series
Table of Contents

Advertisement

UPFLOW VERTICAL VENT
PARTS NEEDED:
!
PARTS NEEDED FOR THIS CONVERSION REQUIRE ITEMS
FROM THE PARTS BAG ONLY. NO OTHER CONVERSION
KITS ARE NEEDED.
FROM PARTS BAG (PROVIDED WITH UNIT)
TUBE C
HOSE
CLAMP
(X3)
TOOLS/MATERIALS NEEDED:
DRILL
1/4" HEX HEAD DRIVER
NOTE: THESE CONVERSION INSTRUCTIONS ARE INTENTIONALLY GENERIC, SOME PARTS MAY BE DIFFERENT IN YOUR FURNACE
2
OPTION DRAIN LEFT
DRILL 1/8"
7/8" PLUG
DISCARD
DETERMINE RIGHT OR LEFT DRAIN OPTION.
LOCATE 7/8" HOLE IN JACKET SIDE.
REMOVE PLUG - DISCARD
DRILL (2) Ø 1/8" HOLES FOR THE BULKHEAD COUPLING.
4A
4a - LEFT SIDE DRAIN OPTION
ATTACH HOSE A (PRE-INSTALLED) TO BULKHEAD COUPLING.
INSTALL HOSE CLAMP ON HOSE OVER BULK HEAD COUPLING.
BULKHEAD
#8 X 1/2"
COUPLING
COUPLING
SCREW
(X2)
1/8" DRILL BIT
PLIERS
TUBING CUTTER
4B
4b
4b1 - CUT TUBE "C" TO FIT CORRESPONDING CABINET WIDTH.
HOSE A
4b2 - INSERT TUBE "C" INTO END "2" OF HOSE- DOUBLE ELBOW
4b3 - SLIDE TWO WIRE CLAMPS OVER TUBE "C", SLIDE ONE WIRE CLAMP OVER
4b4 - INSTALL TUBE "C" WITH HOSE CLAMP AS SHOWN TO HOSE "A" "PRE ASSEMBLED".
4b5 - ATTACH HOSE - DOUBLE ELBOW TO BULKHEAD COUPLING POSITION WIRE HOSE
NOTE: PLIERS NECCESSARY TO ADD OR REMOVE CLAMPS
1
HOSE -
DOUBLE ELBOW
INTAKE
W/ NUT
INSTALL INTAKE COUPLING IN TOP PLATE
3
OPTION DRAIN RIGHT
7/8" PLUG
DISCARD
DRILL 1/8"
INSTALL BULKHEAD COUPLING USING (2) SCREWS.
INSTALL IN JACKET WITH THE BARBED FITTING
POINTED INTO THE VESTIBULE.
TUBE C
CUT TO FIT
CABINET WIDTH
HOSE A
- RIGHT SIDE DRAIN OPTION
END "1" OF HOSE - DOUBLE ELBOW.
CLAMP.
INSTALL
INSTALL
HOSE-DOBLE
ELBOW
TUBE C
ST-A1194-68-00
(X2)
15

Advertisement

Table of Contents
loading

Table of Contents