Primary Power; Connecting Power Cables To The Ems-830T - ADC WorldDSL EMS-830T User Manual

Exchange office management shelf
Table of Contents

Advertisement

Installation
P
P
RIMARY
OWER
Connect DC power to the shelf through the five-position -48V DC power-terminal strip:
1
Use a flat-blade screwdriver to loosen the screw beneath the -48V connector labeled "A" (see
below). Refer to
Table 9
2
Insert the -48 Vdc cable from your primary -48 Vdc power supply, then tighten the screw you loosened in
step 1.
3
Use a flat-blade screwdriver to loosen the screw beneath the RTN connector labeled "A."
4
Insert the RTN cable from your primary -48 Vdc power supply, then tighten the screw you loosened in step 3.
5
Use a flat-blade screwdriver to loosen the screw beneath the Frame Ground.
6
Connect your isolated earth ground cable, then tighten the screw you loosened in step 5.
10
for the Power-terminal strip pinouts.
Figure 3. Connecting Power Cables to the EMS-830T
Table 9. DC Power-Terminal Strip Pinouts
Pin
Signal
1
-48V_A
2
-48V_B
3
-48V_RTN_A
4
-48V_RTN_B
5
CGND
January 31, 2003
W0207-A
Description
-48Vdc A
-48Vdc B
-48Vdc A Return
-48Vdc B Return
Chassis Ground
LTPE-UM-3157-01
Figure 3
EMS-830T

Advertisement

Table of Contents
loading

Table of Contents