Responsibilities Of Parties; Options; Additional Information - Snorkel MHP 15J Operator's Manual

Hide thumbs Also See for MHP 15J:
Table of Contents

Advertisement

Introduction

Responsibilities of parties

It is imperative that all owners and users of the
MHP15J read, understand, and conform to all ap-
plicable regulations. Ultimate compliance to OSHA
regulations is the responsibility of the employer us-
ing the equipment.
DANGER
ANSI Standard A92.2-1992 clearly identifies
requirements of all parties who might be
involved with Boom-Supported Elevating
Work Platforms.
AUSTRALIAN / NZ STANDARD 2550-10
1994 Also identifies the requirements of all
parties who might be involved with
Boom-Supported Elevating Work
Platforms.
A reprint of the "Manual of Responsibilities for
Dealers, Owners, Users, Operators, Lessors and
Lessees of ANSI/SIA A92.5-1992 Boom Sup-
ported Elevating Work Platforms" is available from
Snorkel dealers or from the factory upon request.
Copies are also available from the Scaffold Indus-
try Association, Inc., 14039 Sherman Way, Van
Nuys, CA 91405-2599.

Options

The use of optional equipment is discussed in the
"Options" chapter 11.
The options you will find discussed there are:
1. Air line to platform.
2. Dual fuel.
3. Work lights.
4. Sandblast protection kit.
5. RCD/ELCB AC outlet.
6. Flashing light.
7. Platform rotator.
8. Self levelling stabilisers.
page - iv

Additional information

For additional information, contact your local
dealer.
Snorkel
2/26 Redfern Street
Wetherill Park NSW 2164
Australia
Snorkel
PO Box 1041
Levin 5500
New Zealand
MHP15J – 11995A

Advertisement

Table of Contents
loading

Table of Contents