Air Line To Platform
This consists of *" pressure flex yellow hose rated
at 150 psi working pressure, fitted with quick dis-
connect couplers at each end .
Dual Fuel
This option consists of an AC motor rated at either
110 or 230 volts AC 50/60Hz. A selector switch is
used to change from gasoline to electric. The same
controls are used to stop and start the electric motor.
This option is used in shopping malls and other built
up areas.
Work Lights
Rubber encased work lights can be fitted to the
platform guardrails. The lights are swivel mounted
and each has its own switch.
Flashing Light
For this option see Chapter 2 page 3
RCD/ELCB AC Outlet
A 3 core wire rated at 600 volts AC 15 amps is run
up the booms as standard.
For this option see Chapter 2 Page 3.
Sandblast Protection Kit
This option consists of a bellows type cover fitted to
each boom cylinder shaft.
The bellows prevent sand and paint from damaging
the cylinder rods and seals, and thus prevent hy-
draulic oil leaks.
CAUTION
DO NOT paint or sandblast from an MHP15J
unless the cylinder rods are protected by
bellows.
Platform Rotator
This option allows the operator to move the plat-
form around the boom, 45
gain better access to work sites.
Self Levelling Stabiliser
This option consists of a microprocessor that con-
trols the stabilisers. The stabilisers will 'self level'
the platform when the auto mode is selected, alter-
natively the stabilisers can be used individually
when in the manual mode.
MHP15J – 11995A
o
each side of center, to
Chapter 11. Options
page 11 - 1