SPORTS ART DF-208 Owner's Manual page 29

Multi press
Table of Contents

Advertisement

STEP 10
Cable Installation (Continued)
(b) Cut off the zip tie in area E to uncurl the cable. Pull the cable to thread
through the pulley in area F as indicated by the arrows and then secure
the pulley cover with screws (67). And thread the cable through pulley
(A20) in area G and secure with screws (75). Next thread the cable as
indicated by the arrows through the upper pulley (A20) in area H and
push the pulley onto its mount as shown and then secure the cover (71)
with screws (72). Thread the cable through the pulley in area K and
secure the cover (71) with screws (72). Finally, secure the cable nut onto
the weight stack rod as shown.
28

Advertisement

Table of Contents
loading

Table of Contents