7341 Calibration Bath
User's Guide
5.3.1
5.3.2
5.3.3
18
Installation On A Wood Floor
The wood floor installation kit includes lag bolts. Drill three 1/8 inch x 1 inch
deep (approximately 3 mm x 25.5 mm) pilot holes using the tipping bracket to
mark the hole placement. Use the lag bolts to install the bracket to the floor.
Ensure that the bracket is installed in such a way that the bath will have a mini-
mum 6 inches of clearance for air circulation. (See Figure 2). Screw the bracket
securely to the floor.
Wall
Figure 2 Tipping Prevention Bracket Installation
Installation On a Concrete Floor
Using a concrete drill and concrete drill bit, drill three ¼ inch x 1 ¼ inch deep
(approximately 6.5 mm x 32 mm) holes in the concrete floor using the bracket
to mark the hole placement. Drop the flare anchor bolt into the hole. Tightening
the screw expands the anchor in the drilled hole and secures the tipping
bracket. Ensure that the bracket is installed in such a way that the bath will
have a minimum of 6 inches of clearance for air circulation. (See Figure 2).
Screw the bracket securely to the floor.
Installation Of The Bath
Slide the back casters of the bath completely into the tipping bracket. Lock the
front casters of the bath. Check that the bath is securely locked into the tipping
Caster Slots