Connection On Pcb - Sanyo MCO-5M Service Manual

Multi-gas incubator
Hide thumbs Also See for MCO-5M:
Table of Contents

Advertisement

Connection on PCB

The following shows connections of connector (CN) on main PCB.
Connector
CN1
Power transformer
CN2
Power supply
1
2:
CN4
3
4:
CN5
CO
sensor
2
CN6
Door switch
CN8
Switch, display PCB (CN101)
1
2 CO
CN9
3
4 CO
Remote alarm output
CN10
1
2 Open during normal operation
CN11
Communication PCB (option)
CN12
3
4 Hinge sub heater (R), (L)
CN13
Buzzer
CN14
UV lamp relay (option)
CN15
Water sensor
CN16
O
sensor
2
1
2 O
CN17
3
4 O
CN101
Display PCB (CN8)
The following shows connections of connector (CN) on power PCB.
Connector
CN301
Main PCB
1: Heater for heat control (6pcs)
CN302
3: Bottom heater (4pcs)
5: Front panel heater, Door heater (2pcs)
CN303
3: Agitating fan motor
Connects to
Overheat protect sensor
Temperature sensor
valve
2
auto changer valve (option)
2
valve
2
valve
2
Connects to
Usage
To supply the power to PCB.
To supply the power AC36V for
hinge sub heater
To supply the power to PCB.
To measure the temperature of
each parts.
Input from CO
sensor
2
To detect the door opening.
To control CO
valve ON and OFF.
2
Output of remote alarm contact
36VAC
For alarm
To check water level in humidifying
pan.
Input from O
sensor
2
To control O
/N
2
OFF.
To control heater
To control agitating fan motor.
27
#1-2: 8.5VAC
#3-4: 18VAC
#3-5: 18VAC
#1: 5VDC
#2: GND
#1:GND
#2:IN+
#3:IN-
#4:+15V
#1:GND
#1-2: 24VAC
#3-4: 24VAC
#1:COM
#2:NO
#3:NC
#1:VCC
#2:GND
#3:
#1:+5V
#2:GND
#3:GND
#4:O
#1-2: 24VAC
valve ON and
2
#3-4: 24VAC
#5-6: 24VAC
Use
Voltage
sensor input
input
2

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents