Type
Softening DN Post
Softening DN Pre
Softening UP Post
Softening UP Pre
Softening DN Post 2.0" Valve
Softening DN Pre 2.0" Valve
STEP 1S
STEP 2S
STEP 3S
STEP 4S
STEP 5S
STEP 6S
STEP 7S
Page 56
Fill
Service
9.5 LBS
240
9.5 LBS
240
6 MIN
240
Cycle
Backwash
Rinse
Draw (Up or Down)
Fill (all but 2" valve)
Fill (1.5" MIN or 2" valve)
Softening
Step 1S – Press NEXT and
appear in 5 seconds the lock on the valve is activated. To unlock press
sequence, then press NEXT and
Step 2S – Choose the SOFTENING program desired (see table) using
Step 3S. Press REGEN to exit OEM Softener System Setup.
Step 3S – Select the time for the fi rst cycle using the
Press REGEN to return to previous step.
Step 4S – Select the time for the second cycle using the
Press REGEN to return to previous step.
Step 5S – Select the time for the third cycle using the
Press REGEN to return to previous step.
Step 6S – Select the time for the fourth cycle using the
Press REGEN to return to previous step.
Step 7S – Select the LBS for the fi fth cycle using the
options in Step 2CS, and 2.0 is selected, FILL is in minutes. If 1.5 is selected in Step 2CS, setting Step
7CS determins if the valve is in lbs. or minutes. Press NEXT to go to Step 8S. Press REGEN to return
to previous step.
OEM Softener System Setup
Backwash
Draw
8
8
8
8
Units
Range
MIN
1-120 or OFF
MIN
1-120 or OFF
MIN
1-160 or OFF
LBS
0.1-200 or OFF
MIN
0.1-99.0 or OFF
MIN
1-480 or OFF
simultaneously for 3 seconds and release. If screen in Step 2S does not
simultaneously for 3 seconds and release.
Backwash
60
8
60
8
60
8
60
8
60
8
60
8
Default
8
8
60
9.5
6
240
, NEXT,
or
or
button. Press NEXT to go to Step 4S.
or
button. Press NEXT to go to Step 5S.
or
button. Press NEXT to go to Step 6S.
or
button. Press NEXT to go to Step 7S.
or
button. When both 2.0L and 2.0 are
Rinse
Fill
8
9.5 LBS
8
8
9.5 LBS
8
8
6 MIN
8
, and CLOCK in
. Press NEXT to go to
Need help?
Do you have a question about the WS1 CD Matrix and is the answer not in the manual?
Questions and answers