Advance acoustic Protect II RIS User Manual page 39

Table of Contents

Advertisement

Available languages

Available languages

Laying out the panels (gores)
The PROTECT II RIS L, XL and the PROTECT NANO each have 20
panels. Find panel 1, then count through half the panels and separate
their lines from those of the other half. You should now have panels
1–10 on the right and 11-20 on the left. Starting with panel 10 now lay
the panels out nice and flat, from 10-1. Similarly lay out 11-20 neatly
on the other side (Pic 5).
The canopy is now arranged so that panel 1 is on top on the right,
and panel 20 on top on the left. Then straighten out the top end of
the canopy, at the packing loops. Carefully tidy up the folds at this
end and lay the tops of the panels flat on each other.
The canopy should then be folded in an S shape, with the lines run-
ning through the middle. Note that the width of the folded canopy
should not be wider than the inner container (Pic 6).
Caution: Make sure that you TAKE AWAY the piece of line
that secured the pack loops: otherwise the parachute will not
open.
Pic 5
Pic 6
39

Advertisement

Table of Contents
loading

This manual is also suitable for:

Protect nano

Table of Contents