9 Commissioning
NOTICE
To perform an underfloor heating screed dryout, room frost
protection needs to be disabled ([2‑06]=0). By default, it is
enabled ([2‑06]=1). However, due to the "installer-on-site"
mode (see "Checklist before commissioning"), room frost
protection will be automatically disabled for 36 hours after
the first power-on.
If the screed dryout still needs to be performed after the
first 36 hours of power-on, manually disable room frost
protection by setting [2‑06] to "0", and KEEP it disabled
until the screed dryout has finished. Ignoring this notice will
result in cracking of the screed.
NOTICE
For the underfloor heating screed dryout to be able to start,
make sure the following settings are met:
▪ [4‑00]=1
▪ [C‑02]=0
▪ [D‑01]=0
▪ [4‑08]=0
▪ [4‑01]≠1
The installer can program up to 20 steps. For each step he needs to
enter:
1 the duration in hours, up to 72 hours,
2 the desired leaving water temperature.
Example:
T
24h (1)
36h (2)
25°C (1)
35°C (2)
A1
T
Desired leaving water temperature (15~55°C)
t
Duration (1~72 h)
(1)
Action step 1
(2)
Action step 2
To program an underfloor heating screed dryout
schedule
1 Set the user permission level to Installer. See
permission level to Installer" on
2 Go to [A.7.2]:
> Installer settings > Commissioning > UFH
screed dryout > Set dryout schedule.
3 Use the
,
,
, and
▪ Use
and
to scroll through the schedule.
▪ Use
and
to adjust the selection.
If a time is selected, you can set the duration between 1 and
72 hours.
If a temperature is selected, you can set the desired leaving
water temperature between 15°C and 55°C.
4 To add a new step, select "–h" or "–" on an empty line and
press
.
5 To delete a step, set the duration to "–" by pressing
6 Press
to save the schedule.
It is important that there is no empty step in the program.
The schedule will stop when a blank step is programmed
OR when 20 consecutive steps have been executed.
Installer reference guide
68
t
"To set the user
page 47.
to program the schedule.
.
To perform an underfloor heating screed dryout
INFORMATION
Preferential kWh rate power supply cannot be used in
combination with underfloor heating screed dryout.
Prerequisite: Make sure there is ONLY 1 user interface connected
to your system to perform an underfloor heating screed dryout.
Prerequisite: Make sure that the leaving water temperature home
page and room temperature home page are turned OFF.
1 Go to [A.7.2]:
> Installer settings > Commissioning > UFH
screed dryout.
2 Set a dryout program.
3 Select Start dryout and press
4 Select OK and press
.
Result: The underfloor heating screed dryout starts and following
screen will be shown. It stops automatically when done. To stop it
manually, press
, select OK and press
Tue
Screed dryout
Current step
1
Remaining
14d 12h
Desired LWT
25°C
Stop
To readout the status of an underfloor heating
screed dryout
1 Press
.
2 The current step of the program, the total remaining time, and
the current desired leaving water temperature will be displayed.
INFORMATION
There is limited access to the menu structure. Only the
following menus can be accessed:
▪ Information.
▪ Installer settings > Commissioning > UFH screed
dryout.
To interrupt an underfloor heating screed dryout
When the program is stopped by an error, an operation switch off, or
a power failure, the U3 error will be displayed on the user interface.
To resolve the error codes, see
error codes"  on page 
72. To reset the U3 error, your User
permission level needs to be Installer.
1 Go to the underfloor heating screed dryout screen.
2 Press
.
3 Press
to interrupt the program.
4 Select OK and press
.
Result: The underfloor heating screed dryout program is stopped.
When the program is stopped due to an error, an operation switch-
off, or a power failure, you can read out the underfloor heating
screed dryout status.
5 Go to [A.7.2]:
> Installer settings > Commissioning > UFH
screed dryout > Dryout status > Stopped at and followed by the
last executed step.
6 Modify and restart the execution of the program.
EWAQ+EWYQ006+008BAVP + EK(2)CB07CAV3 +
Packaged air-cooled water chillers and packaged air to water heat
.
.
15:10
"12.4  Solving problems based on
EKMBUHCA3V3+9W1
pumps
4P492901-1 – 2017.06

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents