No.
Part name
Heat
12
exchanger
AMP Air Conditioning
Procedure
1. Detachment
1) Recover refrigerant gas.
2) Remove the refrigerant pipe at indoor unit
side.
3) Perform work of procedure 10 -1.
4) Take off screws (Ø4 × 10, 3 pcs.) fixing the
piping cover to remove the piping cover.
5) While holding the heat exchanger, remove
fixing band and fixing screws (Ø4 × 10, 3 pcs.)
and then remove the heat exchanger.
2. Attachment
1) Mount parts in order, heat exchanger
→ fixing band → piping cover → drain pan
→ bell mouth → electric parts box as original.
NOTE)
Arrange wires as original.
2) Attach the removed connectors and wires as
original.
3) Connect the refrigerant pipe as original, and
then perform vacuuming.
<Details of sensor lead wire drawing>
TCJ sensor
(Black)
TC sensor
(Red)
Wind pipe cover over the header,
attach a sensor on it.
(Do not set the head of tie wrap upward.)
Fixing band
– 96 –
www.ampair.co.uk | sales@ampair.co.uk
Remarks
Piping cover
Piping cover
3 screws
Fixing band for
heat exchanger
2 fixing screws for heat exchanger