Server Precautions - Polycom READIMANAGER LX100 Getting Started Manual

Polycom server user manual
Hide thumbs Also See for READIMANAGER LX100:
Table of Contents

Advertisement

P
R
M
LX100 G
S
G
OLYCOM
EADI
ANAGER
ETTING
TARTED
UIDE
In multiple rack installations, the racks should be coupled
together.
Always make sure the rack is stable before extending a
component from the rack.
You should extend only one component at a time - extending two
or more simultaneously may cause the rack to become unstable.

Server Precautions

Before you install the rails, determine the placement of each
component in the rack.
Install the heaviest server components on the bottom of the rack
first, and then work up.
Use a regulating uninterruptible power supply (UPS) to protect the
server from power surges, voltage spikes and to keep your
system operating in case of a power failure.
Allow the power supply units to cool before touching them.
Always keep the rack's front door and all panels and components
on the servers closed when not servicing to maintain proper
cooling.
4

Advertisement

Table of Contents
loading

Table of Contents