D And E Series Components - IVT GreenlineC Manual To Installation, Commissioning And Maintenance

Table of Contents

Advertisement

D and E series components

Please note: The picture is of the E series, 1-phase.
The D series has two connections on the hot side and does not include a 3-way valve and immersion
heater. The particle filter is supplied separately and is mounted outside the heat pump.
3-way valve that changes
between heating and
domestic hot water.
Cleanable particle
filter with cut-off.
Immersion heater.
Circulation pump
on the hot side.
Flexible hoses on the
hot side for vibration
free operation.
Frequency adapted
soundproof cover.
9
Electrical connection.
Control panel with
large display.
Enclosed electrical box with
motor protection reset and
circuit breaker for heat pump
and immersion heater.
Control unit Rego600.
Reset button for over-
heat protection on the
immersion heater.
Heat exchanger.
Insulated corrosion protected
circulation pump for the heat
transfer fluid system.
Compressor.
Expansion valve.
Sight glass.

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

GreenlineeGreenlined

Table of Contents