Internal Floating Piston (Ifp) Installation; 400 Hour Service - SRAM Reverb Stealth2017 Service Manual

Rock shox
Table of Contents

Advertisement

4 0 0 H o u r S e r v i c e
I n t e r n a l F l o a t i n g P i s t o n ( I F P ) I n s t a l l a t i o n
Install the IFP tube with the cross holes facing up, into the upper post.
1
Use your finger to rotate the IFP tube in a circular and side to side
motion until the IFP tube seats itself onto the seal inside the bottom of
the upper post.
Push down firmly on the IFP tube until it snaps securely into the upper
post. When the IFP tube snaps into place, a click will be heard. Ensure
the IFP tube is secured and centered.
NOTI CE
Do not scratch the inside of the upper post with the IFP tube. Scratches
can cause leaks.
The IFP tube should be below the top of the upper post when it is
installed correctly.
Apply SRAM® Butter grease around the inside and outside of the new
2
internal floating piston (IFP). Install the IFP into the upper post and onto
the IFP tube. Push the IFP down until it is level with the top of the
IFP tube.
The IFP is symmetrical. Orientation of the IFP is not critical to
installation.

Internal Floating Piston (IFP) Installation

25

Advertisement

Table of Contents
loading

Table of Contents