Chapter 2 - CommissioningSystem Initial Verification
Chapter 2 - Commissioning
2.3

System Initial Verification

After powerup, the BTS automatically starts a self-testing procedure to verify that the BTS has been
correctly assembled and installed on site, all its components are functioning properly, and that it is now
ready for commissioning. During the self-test, the LEDs indicate the working status of the various
components.
To perform testing:
1
Verify that the BTS is connected to an AC power source.
2
Upon completion of the internal test and boot up (up to 5 minutes), verify that the following LEDs are
lit as follows:
Name
PWR
ALRM
GPS
Upon power-up completion, the BTS is ready for basic network definition.
BreezeCOMPACT System Manual

Table 2-1: BreezeCOMPACT LEDs

Description
Functionality
Power indication
Alarm indication
GPS status indication
Off:There is no 4*V to the internal main power supply module
RED: Power is provided to the unit and the internal main power
supply module is OK
Green: All the internal digital power supply rails are OK
Lights at power up
Turns off after power up is complete
Lights on runtime in case of critical failure
Lights at power up
Turns off after power up is complete
Lights when the GPS is reporting at least four satellites or more
reception.
Blinks (0.5 Sec on, 0.5 Sec off) when the number of satellites
decreases from 4 to 3 or 2 satellites or the min. configured value.
Turns off when only one satellite is received, or the minimum
configured value of GPS is not operational or not installed.
Lights again when the unit is regaining satellites reception of 4
satellites or more.
System Initial Verification