Dinolift DINO 135TB Operating Instructions Manual

Dinolift DINO 135TB Operating Instructions Manual

Aerial work platform
Hide thumbs Also See for DINO 135TB:
Table of Contents

Advertisement

OPERATING
INSTRUCTIONS
• 150TB • 180TB
DINO 135TB
Manufacturer:
Dealer:
Dinolift Oy
Raikkolantie 145
FI-32210 LOIMAA
Tel. + 358 20 1772 400
info@dinolift.com
www.dinolift.com

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the DINO 135TB and is the answer not in the manual?

Questions and answers

Subscribe to Our Youtube Channel

Summary of Contents for Dinolift DINO 135TB

  • Page 1 OPERATING INSTRUCTIONS • 150TB • 180TB DINO 135TB Manufacturer: Dealer: Dinolift Oy Raikkolantie 145 FI-32210 LOIMAA Tel. + 358 20 1772 400 info@dinolift.com www.dinolift.com...
  • Page 3 TRANSLATION OF THE ORIGINAL INSTRUCTIONS Valid from serial number 135TB 130104 --> 150TB 150017 --> 180TB 180008 --> SERIAL NUMBERS CHANGE DATE 135TB: 131104 --> 150TB: 150017--> Hätäseisvalo, jako käyttö ja huolto-osaan 11.8.2016 180TB: 180008-->...
  • Page 4: Table Of Contents

    Operating instructions • DINO 135TB • 150TB • 180TB CONTENTS TO THE OPERATOR ....................7 1.1. OVERVIEW OF THE UNIT .................. 8 1.2. INTENDED USE OF THE WORK PLATFORM ........... 8 TECHNICAL SPECIFICATIONS ................. 9 2.1. DIMENSION DRAWINGS ................. 10 2.1.1.
  • Page 5 5.3. TRANSFERRING THE LIFT ................44 5.3.1. Preparing the lift for transport ..................44 5.3.2. Using the driving device ....................45 5.3.3. Towing the lift ....................... 47 5.3.4. Lifting the device ......................48 5.4. LONG-TERM STORAGE .................. 49 5.3. IN CASE OF EMERGENCY ................50 5.3.1.
  • Page 6 Operating instructions • DINO 135TB • 150TB • 180TB BLAN K...
  • Page 7: To The Operator

    Dinolift Oy is constantly developing its products. For this reason, the contents of this manual might not always be in full compliance with the most recent version of the product. Dinolift Oy reserves the right to modify the product without prior notice. Dinolift Oy assumes no liability for any problems caused by changed or missing data or mistakes in this manual.
  • Page 8: Overview Of The Unit

    Operating instructions • DINO 135TB • 150TB • 180TB 1.1. OVERVIEW OF THE UNIT This unit is a trailer mounted, towable aerial work platform. It is an aerial work platform, which complies with the EN280 type 1, where travelling is only allowed with the platform in transport configuration.
  • Page 9: Technical Specifications

    TECHNICAL SPECIFICATIONS 135TB 150TB 180TB Max. working height 13.5 m 15.0 m 18.0 m Max. platform height 11.5 m 13.0 m 16.0 m Max. outreach to the side 9.1 m 10.0 m 10.7 m Boom rotation continuous Platform rotation 90° Turn area refer to the reach diagram Support width...
  • Page 10: Dimension Drawings

    Operating instructions • DINO 135TB • 150TB • 180TB 2.1. DIMENSION DRAWINGS 2.1.1. 135TB...
  • Page 11: 150Tb

    2.1.2. 150TB...
  • Page 12: 180Tb

    Operating instructions • DINO 135TB • 150TB • 180TB 2.1.3. 180TB...
  • Page 13: Reach Diagram

    2.2. REACH DIAGRAM 2.2.1. 135TB 215KG 475LB 120KG 265LB...
  • Page 14: 150Tb

    Operating instructions • DINO 135TB • 150TB • 180TB 2.2.2. 150TB 215KG 475LB 120KG 265LB 80KG 175LB...
  • Page 15: 180Tb

    2.2.3. 180TB 215KG 475LB 120KG 265LB 80KG 175LB...
  • Page 16: Example Of The Machine's Nameplate

    Operating instructions • DINO 135TB • 150TB • 180TB 2.3. EXAMPLE OF THE MACHINE’S NAMEPLATE The name of the manufacturer, and the production number and serial number of the machine have been marked on the nameplate as shown in the picture below.
  • Page 17: Example Of Eu Declaration Of Conformity

    In designing the machine, the following harmonised standards have been applied: SFS-EN 280:2013, SFS-EN 60204-1/A1, SFS-EN-ISO 12100 The person, who has compiled the technical construction file: Santtu Siivola Chief Engineer Dinolift Oy, Raikkolantie 145, FI-32210 Loimaa, FINLAND Loimaa 07.01.2015 -----------------------------------------...
  • Page 18: Sample Of Inspection Protocol For The Access Platform

    Operating instructions • DINO 135TB • 150TB • 180TB 2.5. SAMPLE OF INSPECTION PROTOCOL FOR THE ACCESS PLATFORM TEST CERTIFICATE DATE: www.dinolift.com START-UP TESTS: Inspection place: Dinolift Oy Inspector's signature: BASIC KNOWLEDGE Manufacturer: Dinolift OY Place of manufacture: Finland Address:...
  • Page 19 Raikkolantie 145 FIN-32210 LOIMAA, FINLAND Tel. +358 - 20 - 1772 400, Fax +358 - 2 - 7627 160, e-mail: info@dinolift.com The initial inspection and test loading of the Dino aerial work platforms is performed by the manufacturer. A protocol, drawn up during the inspection, will accompany the lift.
  • Page 20: Safety

    Operating instructions • DINO 135TB • 150TB • 180TB SAFETY All the essential safety instructions and warnings, relevant to transport, use and maintenance of the lift, are described in this chapter. DANGER Failure to observe these instructions and safety regulations may cause a severe injury or WARNING even death.
  • Page 21 TRANSFERS Observe the maximum allowed gradient when transferring the lift. During transfer in rough terrain, always try to position yourself higher than the machine. Beware of fixed or moving obstacles in the terrain or near the lift while driving. Make sure that you have a clear view of the driving path.
  • Page 22 Operating instructions • DINO 135TB • 150TB • 180TB LIFTING AND WORKING ON THE PLATFORM Never exceed the maximum number of persons, maximal loading or lateral force, allowed for the lift. Never add load onto the platform while in the upper position.
  • Page 23 OPERATING CONDITIONS The weather conditions, such as wind, visibility and rain, must always be taken into account so that these will not adversely affect the safe performance of the lifting operations. The use of the lift is prohibited, if the temperature drops under -20 °C or the wind speed exceeds 12.5 m/s Wind speed ( m/s) Conditions on land...
  • Page 24: Safety-Related Notifications

    Operating instructions • DINO 135TB • 150TB • 180TB 3.2. SAFETY-RELATED NOTIFICATIONS The following safety alert symbols and safety signal words are used in this manual and in safety labels. Observe all the safety instructions that follow these symbols, in order to avoid dangerous situations and personal injuries.
  • Page 25: Safety Devices

    3.3. SAFETY DEVICES 1. Supervision of transport position of the boom The safety limit switch RK3 prevents the operation of the outriggers and the driving device when the boom is not resting on the transport support. The switch is located on the tow-bar at the transport support.
  • Page 26 Operating instructions • DINO 135TB • 150TB • 180TB The green light in the control centre on the platform is lit, when the platform is within the allowed operating range. The reach are limit switch RK4 stops the movements that impair the stability of the lift (extending the telescope and lowering the boom) at a predetermined position.
  • Page 27 4. Supervision of the telescope chain The extension chains for the telescope are doubled. If the load-bearing chain slackens or breaks, the doubling chain prevents the movements of the telescope, and the safety switch RK7 breaks the emergency stop circuit. A - A ~32 mm DOUBLING CHAIN...
  • Page 28 Operating instructions • DINO 135TB • 150TB • 180TB 6. Safety devices for hose rupture All the load-bearing cylinders are equipped with valves for rupture or leak in the hydraulic system, which prevent the load from falling. Prevent the inching of the...
  • Page 29: Structure And Functions Of The Work Platform

    STRUCTURE AND FUNCTIONS OF THE WORK PLATFORM The denominations of the machine’s essential parts and concepts, which are used later in these instructions, are described on the following pages. 4.1. STRUCTURE OF THE WORK PLATFORM Platform control panel Platform Levelling cylinder of the platform (slave) Boom extension 3 Boom extension 2...
  • Page 30: Functions Of The Work Platform

    Operating instructions • DINO 135TB • 150TB • 180TB 4.2. FUNCTIONS OF THE WORK PLATFORM Turn counter- clockwise Left Drive direction Right Turn clockwise Levelling the platform Lifting/lowering the boom Turning the platform Turning the boom...
  • Page 31: Operating Controls For The Functions

    4.3. OPERATING CONTROLS FOR THE FUNCTIONS 4.3.1. Operating controls in the chassis control centre Selector switch Lever switch for levelling of platform Ignition off Signal light for safety device (RK5) Kpl/kone VILAKONE OY Operation from the chassis control Piirustuksen numero Revisio Drive to the front Ohjetarra, joystick...
  • Page 32 Operating instructions • DINO 135TB • 150TB • 180TB Battery gauge (14) 1. As the current is switched on using the key switch, the operating hours of the motor are displayed on the gauge for 5 seconds. 2. During normal operation, the state of charge of the batteries is displayed in per cents.
  • Page 33: Operating Controls For The Outriggers

    4.3.2. Operating controls for the outriggers Front outrigger, right Front outrigger, left Rear outrigger, left Rear outrigger, right Position indicator of chassis Start button for the motor at the outrigger control unit...
  • Page 34: Operating Controls In The Platform Control Centre

    Operating instructions • DINO 135TB • 150TB • 180TB 4.3.3. Operating controls in the platform control centre Close the cover of the chassis control centre before operating the controls on the platform. The cover must not be locked while the lift is in operation.
  • Page 35 17. Control lever The functions are selected using the buttons at the end of the joystick. Always press the button first, and only after that, turn the handle. The safety connection prevents the movements, if the handle is turned before the button has been pushed down. Boom up Boom to the left Boom to the right...
  • Page 36: Setup With Two Control Levers (Option)

    Operating instructions • DINO 135TB • 150TB • 180TB 4.3.4. Setup with two control levers (option) A setup with two control levers is available as an option for the platform control centre. The left and right control levers(17 right/left) replace the normal control lever 17.
  • Page 37: Operating Instructions

    OPERATING INSTRUCTIONS 5.1. START-UP Before operating the lift, perform all daily maintenance measures listed in the maintenance schedule. The operator must do a worksite inspection and daily maintenance: • at the beginning of each workday • before operating the lift at a new worksite •...
  • Page 38: Positioning The Lift

    Operating instructions • DINO 135TB • 150TB • 180TB 5.1.2. Positioning the lift 1. make sure that the ground is even and hard enough to support the lift in a steady, level position. Max. ground pressure Soil material Density kg/cm²...
  • Page 39: Starting Up

    5.1.3. Starting up 1. Switch on the power via the main switch in the battery compartment on the left-hand side. 2. To access the operating controls, open the cover behind the power unit 3. Turn the selector switch (1) to position 1. 4.
  • Page 40: Operation

    Operating instructions • DINO 135TB • 150TB • 180TB DANGER 5.2. OPERATION WARNING Carry out all the daily maintenance routines and inspections in accordance with the CAUTION maintenance instructions before operating the lift. Failure to check the safety devices may cause a serious injury or make the consequences of an accident worse.
  • Page 41: Operating The Lift From The Platform Control Centre

    5.2.2. Operating the lift from the platform control centre Kpl/kone VILAKONE OY 1. Turn the selector switch to the position ”Platform control centre Piirustuksen numero Revisio UCB”, and remove the key. Do not lock the protective cover for the Ohjetarra, joystick 41603606 chassis control centre.
  • Page 42 Operating instructions • DINO 135TB • 150TB • 180TB The platform movements can be operated with continually adjustable speed from the platform control centre (not from the chassis control centre). Only one movement can be operated at a time. If several control levers are operated simultaneously, only the movement with the least resistance will operate.
  • Page 43: Special Instructions For Winter Use

    5.2.3. Special instructions for winter use The lowest allowed operating temperature of the lift is -20 °C In cold conditions, carry out the following special actions in addition to the normal start-up procedure: 1. Let the power pack run for a few minutes before starting the movements. 2.
  • Page 44: Transferring The Lift

    Operating instructions • DINO 135TB • 150TB • 180TB 5.3. TRANSFERRING THE LIFT The lift can be transfered by towing or using its own driving device. The lift may only be moved in the transport position. No persons or load are allowed on the platform during the transportation.
  • Page 45: Using The Driving Device

    5.3.2. Using the driving device The hydraulic driving device is intended for moving the lift within the work area if the towing vehicle cannot be used. During transfer in rough terrain, always try to position yourself higher than the machine. Kpl/kone VILAKONE OY Piirustuksen numero...
  • Page 46 CAUTION Operating instructions • DINO 135TB • 150TB • 180TB NOTICE Be careful not to damage the jockey wheel tube by extending it too much. When moving the lift using the driving device, a suitable length for the jockey wheel's stem can be achieved by adjusting the gap between the lower surface of the tow-bar/brake rod and the wheel to 1-3 cm.
  • Page 47: Towing The Lift

    5.3.3. Towing the lift Connecting to the towing vehicle 1. Lift up and push forward (in the driving direction) the handle of the ball-coupling. Now the ball-coupling is released. 2. Press the ball-coupling onto the towball using only a little force. The connection and locking take place automatically.
  • Page 48: Lifting The Device

    Operating instructions • DINO 135TB • 150TB • 180TB 5.3.4. Lifting the device The device can be lifted using the lugs shown in the picture. The lifting lugs are located symmetrically on both sides of the lift. During lifting the aerial work platform must be in the transport position. Remove all loose material from the top of the frame structures and the work platform before lifting.
  • Page 49: Long-Term Storage

    DANGER WARNING 5.4. LONG-TERM STORAGE Clean the machine carefully, lubricate it and apply protective grease to it before putting it into storage for a longer period of time (see point “Lubrication plan”). Repeat the cleaning and CAUTION lubrication procedures when you resume the operation. NOTICE If you leave the lift standing for a longer period of time, for example over the winter, we recommend propping it up to release any load from the wheels.
  • Page 50: In Case Of Emergency

    Operating instructions • DINO 135TB • 150TB • 180TB 5.3. IN CASE OF EMERGENCY 5.3.1. When at risk of losing the stability Reduced stability can be caused by a fault in the lift, the wind or other lateral force, collapse of the standing base or negligence in providing sufficient support.
  • Page 51: In Case Of Malfunction, When Even The Emergency Descent System Is Not Operational

    The emergency descent system can only be operated from the ground. If you are on the platform, call for help to operate the system. Operation: 1. Retracting the telescope Open the emergency descent valve for the telescope by turning the screw 27 clockwise and retract the telescope completely by pumping with the hand pump 28.
  • Page 52: Instructions For Fault-Finding

    Operating instructions • DINO 135TB • 150TB • 180TB INSTRUCTIONS FOR FAULT-FINDING FAULT REMEDY 1. The electric motor does not start from its start button or if any of the movements is activated The correct operating location has not been Select the correct operating location using the key selected.
  • Page 53 FAULT REMEDY 7. Malfunctions of platform movements – only one of the movements can be operated Lifting and lowering of the boom and the extension of the telescope are not operational, The boom has been overloaded; retract the the red light is illuminated on the platform and telescope and retry the operation (automatic in the chassis control centre, and the buzzer is reset).
  • Page 54 Operating instructions • DINO 135TB • 150TB • 180TB NOTES...
  • Page 55 NOTES...
  • Page 56: Maintenance Schedule

    Operating instructions • DINO 135TB • 150TB • 180TB MAINTENANCE SCHEDULE Maint. Schedule Person responsible Reference Operating Daily Operator instructions 1 month / 100 Maintenance Competent person who is familiar with the lift hours* instructions 6 months / 400 Maintenance...
  • Page 57 Maintenance measures Axles and suspension Driving device Lights Hydraulic oil Hydraulic hoses, pipes and fittings Condition and attachment of battery, electrical devices and wiring Hydraulic pressure Condition of safety limit switches Operation of safety limit switches Operation of overload protection device Load holding and load regulation valves Platform levelling system Platform control devices...
  • Page 58: Schedule For Inspections Required By The Authorities

    Operating instructions • DINO 135TB • 150TB • 180TB 7.1. SCHEDULE FOR INSPECTIONS REQUIRED BY THE AUTHORITIES Inspections must be performed in accordance with local, state or federal regulations, legislation, directives, standards. The manufacturer recommends following inspections, as required by local authorities in platforms country of origin.
  • Page 59: Lubrication Plan

    7.2. LUBRICATION PLAN...
  • Page 60: Routine Maintenance During Operation

    Operating instructions • DINO 135TB • 150TB • 180TB ROUTINE MAINTENANCE DURING OPERATION The maintenance operations, that are the responsibility of the operator, are described in this chapter. The more demanding maintenance operations that require special skills, special tools or specific measurements and adjustment values are instructed in the separate Maintenance Instructions.
  • Page 61: Instructions For Daily Maintenance And Inspections

    8.1. INSTRUCTIONS FOR DAILY MAINTENANCE AND INSPECTIONS 8.1.1. Check the condition of chassis, the boom and the work platform Check visually the condition of the access routes, the work platform, the platform gate and the handrails. Check visually the condition of the boom and the frame structures. 8.1.2.
  • Page 62: Check The Operation Of The Safety Limit Switches

    Operating instructions • DINO 135TB • 150TB • 180TB 8.1.6. Check the operation of the safety limit switches Test the operation of the safety limit switches that prevent the movements of the boom and the outriggers as follows: 1. The lift is in the transport position with the outriggers in the upper position, and the driving device connected.
  • Page 63: Maintenance Of The Batteries

    DANGER WARNING 8.2. MAINTENANCE OF THE BATTERIES CAUTION Electrolytic liquid is highly corrosive – always wear protective clothing and eye guards. NOTICE The batteries generate hydrogen gas during charging – naked flame prohibited, danger of explosion DANGER Always keep the batteries well charged •...
  • Page 64 DANGER Operating instructions • DINO 135TB • 150TB • 180TB WARNING Test the condition of the batteries regularly • Specific weight of the liquid CAUTION 1.277 Battery 100 % charged NOTICE If maintained well, the batteries will last 4-5 years of normal operation. Incorrect use...
  • Page 65 B L A N K...
  • Page 66 Operating instructions • DINO 135TB • 150TB • 180TB BLANK...
  • Page 67: Change Of Owner

    If you have purchased a used DINO lift from some other than the manufacturer, please post your details to the manufacturer using the form on this page, and send it to: info@dinolift.com This information makes it possible for us to provide you with the safety bulletins and other campaigns relevant to your machine.