Follow-up Actions
The follow-up actions includes the following:
l
Observe the LED status of the new card. The switching and control card runs properly
if the RUN LED is green and flashing.
l
View whether the switching and control card type is correct and the status is normal
through command lines. The switching and control card runs properly if it is in INSER-
VICE status.
l
View whether the card version is correct through the command line. If it is not correct,
download the correct version.
l
Save the existing configuration data.
l
Restore the previous backup configuration data to the system.
l
Query the system alarms, notifications and events. Confirm there is no exceptional
alarms, notifications and events.