Phasor Measurement Unit - GE t60 Instruction Manual

Ur series transformer protection system
Hide thumbs Also See for t60:
Table of Contents

Advertisement

5 SETTINGS
a) MAIN MENU

PATH: SETTINGS
SYSTEM SETUP
 PHASOR MEASUREMENT
 UNIT
MESSAGE
MESSAGE
MESSAGE
UR Synchrophasor Implementation
are used within protection relays. If these phasors are referenced to a common time base they are referred to as
PHASORS
a
. A vastly improved method for tracking power system dynamic phenomena for improved power system
SYNCHROPHASOR
monitoring, protection, operation, and control can be realized if Synchrophasors from different locations within the power
system are networked to a central location.
The T60 offers PMU features over two communication standards, IEC61850-9-5 and C37.118. The complete Synchropha-
sor implementation for Firmware version 7.0 is shown in the figure below.
Figure 5–42: COMPLETE SYNCHROPHASOR IMPLEMENTATION
UR Implementation of IEC61850-90-5
Synchrophasor data as measured and calculated by phasor measurement units (PMUs) is very useful to assess the condi-
tion of the electrical power network. The IEEE C37.118-2005 standard defines synchrophasors and related message for-
mats to transmit synchrophasor data. Synchrophasor streaming via IEEE C37.118 has proven to work but the desire to
have a communication mechanism that is compliant with the concept of IEC 61850 has led to the development of
IEC61850-90-5. The IEC61850-90-5 standard defines the packet structure for multicast routing of streamed Sampled Value
(SV) and GOOSE messages known as the R-SV and R-GOOSE respectively.
GE Multilin


PHASOR MEASUREMENT UNIT

 PHASOR MEASUREMENT
 UNIT 1
 AGGREGATOR
 UNIT 1
 IEC 90-5 MSVCB
 CONFIGURATION
 REPORTING OVER
 NETWORK
T60 Transformer Protection System
5.4 SYSTEM SETUP
5.4.8 PHASOR MEASUREMENT UNIT
See below.
See page 5-132.
See page 5-134.
See page 5-136.
5
5-115