Assembly Procedure - ABB Power2 800-M Original Assembly Instructions

Hide thumbs Also See for Power2 800-M:
Table of Contents

Advertisement

Assembly Instructions / Power2 800-M
4
Installing the low-pressure stage
Gas and air lines
The gas and air line gaskets are not included in the ABB Turbo Systems scope of delivery and
must be provided by the enginebuilder.
4.2

Assembly procedure

Figure 6: Installing the low-pressure stage
Attach lifting gear to the two suspension points of the bearing casing.
Check that the orifices specified for the low-pressure stage have been installed in both oil
supply pipes.
Check that the gaskets have been correctly fitted at the oil inlet and the oil outlet in the
bracket.
Align the low-pressure stage on the engine.
Tighten the fixing elements on the foot (see Table 8).
Secure all gas, air, water and oil pipes.
Attach cable connector to the speed sensor.
© Copyright 2016 ABB. All rights reserved.
HZTL455311P0010
Page 13 / 21
Revision -
March 2016

Advertisement

Table of Contents
loading

This manual is also suitable for:

Power2 850-m

Table of Contents