Re-Installation After The Indoor Unit Has Been Repaired - COMFORT-AIRE B-SVH24SA-1 Service Manual

Century svh series inverter single zone ductless mini-split
Table of Contents

Advertisement

Service Manual - SVH 09/12/18/24 Series
and press the check valve on the charge set to
purge the air (be careful of the liquid
refrigerant).
3) Put the charging cylinder onto the electronic
scale and record the weight.
4) Operate the air conditioner at the cooling
mode.
5) Open the valves (Low side) on the charge set
and charge the system with liquid refrigerant.
6).When the electronic scale displays the
proper weight (refer to the gauge and the
pressure of the low side), disconnect the charge
hose from the 3-way valve's service port
immediately and turn off the air conditioner
before disconnecting the hose.
7) Mount the valve stem caps and the service
port
Use torque wrench to tighten the service port
cap to a torque of 18N.m.
Be sure to check for gas leakage.
6.6 Re-installation after the indoor unit has
been repaired
1. Collecting the refrigerant into the outdoor
unit
Procedure
1) Confirm that both the 2-way and 3-way
valves are set to the opened position
Remove the valve stem caps and confirm that
the valve stems are in the opened position.
Be sure to use a hexagonal wrench to operate
the valve stems.
2) Connect the charge hose with the push pin
of handle lo to the 3-way valves gas service
port.
3) Air purging of the charge hose.
Open the handle Lo valve of the manifold valve
slightly to purge air from the charge hose for 5
seconds and then close it quickly.
4) Set the 2-way valve to the close position.
5) Operate the air conditioner at the cooling cycle
and stop it when the gauge indicates 0.1 Mpa
(14.5Psi).
6) Set the 3-way valve to the closed position
immediately
Do this quickly so that the gauge ends up
indicating 0.3Mpa (43.5Psi) to 0.5 Mpa (72.5Psi).
Disconnect the charge set, and tighten the
2-way and 3-way valve's stem nuts.
Use a torque wrench to tighten the 3-way valves
service port cap to a torque of 18N.m.
Be sure to check for gas leakage.
2. Air purging with vacuum pump
1) Completely tighten the flare nuts of the indoor
and outdoor units, confirm that both the 2-way
and 3-way valves are set to the closed position.
2) Connect the charge hose with the push pin of
handle lo to the 3-way valves gas service port.
3) Connect the charge hose of handle hi
connection to the vacuum pump.
4) Fully open the handle Lo of the manifold
valve.
5) Operate the vacuum pump to evacuate.
6) Make evacuation for 30 minutes and check
whether the compound meter indicates
-0.1Mpa (14.5Psi). If the meter does not indicate
-0.1Mpa (14.5Psi) after pumping 30 minutes, it
should be pumped 20 minutes more. If the
pressure can't achieve -0.1Mpa (14.5Psi) after
15
13

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents