Section 1 Introduction; This Manual; Intended Audience - ABB Relion 650 Series REL650 Commissioning Manual

Line distance protection, ansi
Table of Contents

Advertisement

1MRK 506 331-UUS A
Section 1
1.1
1.2
Commissioning Manual
Introduction

This manual

The commissioning manual contains instructions on how to commission the IED. The
manual can also be used by system engineers and maintenance personnel for assistance
during the testing phase. The manual provides procedures for checking of external
circuitry and energizing the IED, parameter setting and configuration as well as
verifying settings by secondary injection. The manual describes the process of testing
an IED in a substation which is not in service. The chapters are organized in
chronological order in which the IED should be commissioned.

Intended audience

This manual addresses the personnel responsible for commissioning, maintenance and
taking the IED in and out of normal service.
The commissioning personnel must have a basic knowledge of handling electronic
equipment. The commissioning and maintenance personnel must be well experienced
in using protection equipment, test equipment, protection functions and the configured
functional logics in the IED.
Section 1
Introduction
9

Advertisement

Table of Contents
loading

Table of Contents