WattStation Pedestal Installation Manual
S S t t e e p p 6 6 : : Using provided template locate the 4 holes.
See figure 2 for reference. Template must be
Removed after locating the holes
S S t t e e p p 7 7 : : Using a hammer drill and carbide tipped
drill bit, drill a hole (1/2" diameter) and at least
5 ½" to 6" deeper, see figure 3 for reference.
S S t t e e p p 8 8 : : Repeat step 7 for all remaining holes
S S t t e e p p 9 9 : : Clean out hole of all debris
S S t t e e p p : : 1 1 0 0 Install EVSE unit securely over Concrete
bed keeping conduits in center with four ½"-6"
anchor bolt holes on EVSE baseplate aligned
with concrete bed holes.
Check local codes to ensure compliance.
See figure 4 for reference.
1 1 1 1
G G E E E E n n e e r r g g y y
F F i i g g u u r r e e – – 2 2
F F i i g g u u r r e e – – 3 3
F F i i g g u u r r e e – – 4 4
© © 2 2 0 0 1 1 2 2 G G E E C C o o m m p p a a n n y y A A l l l l R R i i g g h h t t s s R R e e s s e e r r v v e e d d

Advertisement

Table of Contents
loading

Table of Contents