The input voltage must not exceed the maximum values shown in the technical data, section
2 in order to avoid damaging the equipment.
Operation
Before commissioning the inverter, it is necessary to have a thorough
knowledge of the Instruments chapter 6 and the functions thatis possible
to enable in the commissioning phase.
When the inverter is commissioned operates automatically without the
aid of an operator; the operating state should be controlled through the
equipment's instrumentation (LED's, Aurora Manager LITE).