Closing The - ABB UNO-DM-TL-PLUS-US Product Manual

From 3.3 to 5.0 kw
Table of Contents

Advertisement

C
losing the front cover
During the installation of the cover, the installation sequence must be respected as well as
the tightening torque of the screws (set out in the paragraph on technical data) in order to
maintain NEMA Type 4X enclosure integrity.
At the end of the inverter connection and configuration stage and before
proceeding with the commissioning, the inverter's covers
ing box covers
must be closed.
05
• Insert and screw in the fixing screws.
• Tighten the screws respecting the sequence and the tightening torque
(2.5 Nm / 1.8 ft-lb).
8b
1b
04
3b
5b
1a
05
3a
After having installed the front cover, it is possible to proceed with the
commissioning of the inverter.
- 71 -
5 - Installation
and the
04
6b
4b
2b
7b
4a
2a
wir-

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents