I. PRE-START-UP
j VERIFY THAT ALL PACKAGING MATERIALS HAVE BEEN REMOVED FROM UNIT
j VERIFY INSTALLATION OF OUTDOOR AIR HOOD
j VERIFY INSTALLATION OF FLUE EXHAUST AND INLET HOOD
j VERIFY THAT CONDENSATE CONNECTION IS INSTALLED PER INSTRUCTIONS
j VERIFY THAT ALL ELECTRICAL CONNECTIONS AND TERMINALS ARE TIGHT
j CHECK THAT INDOOR- - AIR FILTERS ARE CLEAN AND IN PLACE
j CHECK THAT OUTDOOR AIR INLET SCREENS ARE IN PLACE
j VERIFY THAT UNIT IS LEVEL
j CHECK FAN WHEELS AND PROPELLER FOR LOCATION IN HOUSING/ORIFICE AND VERIFY
SETSCREW IS TIGHT
j VERIFY THAT FAN SHEAVES ARE ALIGNED AND BELTS ARE PROPERLY TENSIONED
j VERIFY THAT SCROLL COMPRESSORS ARE ROTATING IN THE CORRRECT DIRECTION
j VERIFY INSTALLATION OF THERMOSTAT
II. START-UP
ELECTRICAL
SUPPLY VOLTAGE
COMPRESSOR AMPS 1
COMPRESSOR AMPS 2
SUPPLY FAN AMPS
TEMPERATURES
OUTDOOR- - AIR TEMPERATURE
RETURN- - AIR TEMPERATURE
COOLING SUPPLY AIR TEMPERATURE
PRESSURES
REFRIGERANT SUCTION
REFRIGERANT DISCHARGE CIRCUIT A
j VERIFY REFRIGERANT CHARGE USING CHARGING CHARTS
GENERAL
j ECONOMIZER MINIMUM VENT AND CHANGEOVER SETTINGS TO JOB REQUIREMENTS (IF EQUIPPED)
j VERIFY SMOKE DETECTOR UNIT SHUTDOWN BY UTILIZING MAGNET TEST

START-UP CHECKLIST

(Remove and Store in Job File)
SERIAL NO.:
L1- - L2
L1
L1
L1
_F DB (DRY BULB)
_F DB
_F
CIRCUIT A
CIRCUIT B
CIRCUIT B
43
L2- - L3
L2
L2
L2
_F WB (WET BULB)
PSIG
PSIG
PSIG
PSIG
L3- - L1
L3
L3
L3

Advertisement

Table of Contents
loading

Table of Contents