Deutsch Connectors; Dt/Dtp Series Assembly; Dt/Dtp Series Disassembly - JLG E450A Service And Maintenance Manual

Electric boom lift
Table of Contents

Advertisement

SECTION 7 - BASIC TROUBLESHOOTING, ELECTRICAL INFORMATION, & SCHEMATICS

7.7 DEUTSCH CONNECTORS

DT/DTP Series Assembly

A
C
Figure 7-12. DT/DTP Contact Installation
1. Grasp crimped contact about 25mm behind the con-
tact barrel.
2. Hold connector with rear grommet facing you.
3. Push contact straight into connector grommet until a
click is felt. A slight tug will confirm that it is properly
locked in place.
4. Once all contacts are in place, insert wedgelock with
arrow pointing toward exterior locking mechanism.
The wedgelock will snap into place. Rectangular
wedges are not oriented. Thy may go in either way.
3121127
NOTE: The receptacle is shown - use the same procedure

DT/DTP Series Disassembly

B
D
1. Remove wedgelock using needlenose pliers or a
2. To remove the contacts, gently pull wire backwards,
3. Hold the rear seal in place, as removing the contact
– JLG Lift –
for plug.
A
C
Figure 7-13. DT/DTP Contact Removal
hook shaped wire to pull wedge straight out.
while at the same time releasing the locking finger
by moving it away from the contact with a screw-
driver.
may displace the seal.
B
7-27

Advertisement

Table of Contents
loading

This manual is also suitable for:

E450ajM450aM450aj

Table of Contents