Toshiba RAV-SP1100UT-E Service Manual page 97

Hide thumbs Also See for RAV-SP1100UT-E:
Table of Contents

Advertisement

No.
Part name
ˆ
Reactor
Pulse Modulating
Valve (PMV) coil
Procedure
1) Perform works of items
2) Take off screws fixing the reactor.
(Ø4 x 10L , 2 pcs. per one reactor.
An outdoor unit has two reactors on the
partition plate.)
1. Detachment
1) Perform works of items
2) Remove the coil from PMV body while
pulling it upward.
2. Attachment
1) Match the positioning extrusion of the coil
surely to the concavity of PMV body to fix it.

to
.

ƒ
to
.
97
Remarks
Partition plate
Screws
Reactor
Positioning extrusion
PMV body
Concavity
PMV coil

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Rav-sp560at-eRav-sp1400at-eRav-sp1100at-eRav-sp800at-e

Table of Contents