SMA CLCON-10 Installation Manual page 42

Cluster controller
Hide thumbs Also See for CLCON-10:
Table of Contents

Advertisement

6 Connection and Commissioning
3. For connection to the Cluster Controller using four-conductor connection technology, perform
the following steps:
• On the five-pole plug, unlock conductor entry 1 using a screwdriver and insert the
insulated conductor of the wire into the conductor entry.
• On the five-pole plug, unlock conductor entries 2, 3, 4 and 5 using a screwdriver and
insert the insulated conductors of the connection cable into the conductor entries.
Observe the pin assignment.
4. Insert the five-pole plug into pin row A in terminal X7.
5. On the connection cable, mark the terminal and the pin row to which the connection cable is
assigned. Use the supplied cable tie with caption field.
6. Write down the terminal assignment on the supplied supplementary sheet.
Connecting the Module Temperature Sensor
Additionally required accessories (not included in scope of delivery):
☐ 1 module temperature sensor
☐ 1 connection cable (see Section 6.3, page 28)
Requirements:
☐ The sensor must be technically suitable for connection to the temperature inputs (see Section 9,
page 78).
☐ The connection cable must be prepared for connection to the multipole plug (see Section 6.5,
page 30).
Figure 14: Pin assignment for pin group Temperature input 2
Pin
Signal
B1
GND
B2
I+
B3
V+
B4
V−
B5
I−
42
ClusterController-IA-en-15
Explanation
Shield ground
Current input
Voltage input
Voltage return
Current return
SMA Solar Technology AG
Installation Manual

Advertisement

Table of Contents
loading

This manual is also suitable for:

Clcon-s-10

Table of Contents