SMA CLCON-10 Installation Manual page 41

Cluster controller
Hide thumbs Also See for CLCON-10:
Table of Contents

Advertisement

SMA Solar Technology AG
Connecting the Outside Temperature Sensor
Additionally required material (not included in the scope of delivery):
☐ 1 outside temperature sensor
☐ 1 connection cable (see Section 6.3 "Cable Requirements", page 28)
Requirements:
☐ The sensor must be technically suitable for connection to the temperature inputs (see Section 9,
page 78).
☐ The connection cable must be prepared for connection to the multipole plug (see Section 6.5,
page 30).
Figure 13: Pin assignment for pin group Temperature input 1
Pin
Signal
A1
GND
A2
I+
A3
V+
A4
V−
A5
I−
Procedure:
1. Connect the connection cable to the outside temperature sensor (see the manual from
manufacturer). Trim the unneeded insulated conductors up to the cable shield and note down
the conductor colors.
2. For connection to the Cluster Controller using two-conductor connection technology, perform
the following steps:
• On the five-pole plug, unlock conductor entry 1 using a screwdriver and insert the
insulated conductor of the wire into the conductor entry.
• On the five-pole plug, unlock conductor entries 3 and 4 using a screwdriver and insert the
insulated conductors of the connection cable into the conductor entries. Observe the pin
assignment.
• At terminal X7 in pin row A, place a bridge between pin 2 and pin 3 and between pin 4
and pin 5.
Installation Manual
Explanation
Shield ground
Current input
Voltage input
Voltage return
Current return
6 Connection and Commissioning
ClusterController-IA-en-15
41

Advertisement

Table of Contents
loading

This manual is also suitable for:

Clcon-s-10

Table of Contents