Installation Procedure - GE IC755CxW07CD SERIES User Manual

Operator interface
Table of Contents

Advertisement

4.4 Installation Procedure

To order replacement gaskets,
refer to the part number listed
in
Appendix
B.
Panel Thickness:
1.0 to 5.0 mm
(0.04 to 0.20 in)
IC755CxW07CDx Panel Cutout Dimensions
Panel Thickness:
1.6 to 5.0 mm
(0.06 to 0.20 in)
IC755CxS12CDx Panel Cutout Dimensions
Installation
For public disclosure
Observe the following guidelines to properly mount and install the QuickPanel
Interface:
To properly mount the QuickPanel
The metal enclosure panel should ensure proper thickness and rigidity suitable to
minimize impact to the QuickPanel
To avoid gasket degradation, limit repeated insertions or removals of the unit and
retightening of the mounting clips. For full protection, always use a fresh gasket.
The unit will not fit through the cutout with any cables connected, or with the power
supply plug inserted in the socket.
Caution
� � To install the QuickPanel
1.
Cut an opening in the panel according to the specifications in the following figures.
Note Panel cutout tolerances are +0.50, –0.00 mm (+0.02, –0.00 in).
183.50 mm (7.22 in)
302 mm (11.89 in)
+
, the enclosure should be of metal material.
+
.
When installing the QuickPanel
careful attention while handling the unit so it does not
drop and damage the unit.
+
Panel Thickness:
1.6 to 5.0 mm
(0.06 to 0.20 in)
IC755CxS10CDx Panel Cutout Dimensions
Panel Thickness:
1.6 to 5.0 mm
(0.06 to 0.20 in)
IC755CxS15CDx Panel Cutout Dimensions
+
Operator
+
into the panel, pay
266 mm (10.47 in)
379 mm (14.92 in)
GFK-2847F User Manual 31

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents