Pre-Installation Checks; Unpacking And Inspection - GE IC755CxW07CD SERIES User Manual

Operator interface
Table of Contents

Advertisement

2 Pre-installation Checks

2.1 Unpacking and Inspection

For phone numbers and email
addresses, refer to the section,
Contact
Information.
Pre-installation Checks
For public disclosure
This chapter provides information for performing a pre-installation check of the
QuickPanel
+
Operator Interface.
Before installing and using the QuickPanel
Unpacking and Inspection
Basic Setup
Initial Startup
Runtime Setup
Firmware Updates
Shutdown
Upon receipt of the QuickPanel
containers for damage. If any part of the system is damaged, notify the carrier
immediately. The damaged shipping container should be saved as evidence for inspection
by the carrier. It is the consignee's responsibility to register a claim with the carrier for
damage incurred during shipment. However, we will fully cooperate should such action
be necessary.
After unpacking the unit, record all serial numbers. Serial numbers are required if you
need to contact Customer Care during the warranty period. Shipping containers and
packing material should be saved in case it is necessary to transport or ship the unit.
Verify that all system components have been received and agree with the order. If the
system received does not agree with your order, contact Customer Care.
Before initial powerup, inspect the unit for loose or damaged components. If damage is
found (such as bent component leads or loose components), contact GE Intelligent
Platforms for additional instructions.
Caution
+
, complete the following procedures:
+
Operator Interface, carefully inspect all shipping
Do not apply power to the unit if it has visible damage.
Applying power to a unit with damaged components
may cause additional damage.
GFK-2847F User Manual 15

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents