5. Enabling the boiler
5 ENABLING THE BOILER
59970.LT.GB.W7H.040
LT.AL.W7H.000.225
LT.AL.W7H.000.212
R
LT.NL.W6H.000.079
8
• Check that the system is full of water and fully vented.
• Turn on the boiler gas tap.
• Switch on the boiler at the fused spur unit; the boiler will run the start-up program.
230 V
- A display test will briefly appear showing all segments of the display.
fK
pK
- A venting cycle of 3 minutes now follows, the version numbers will be displayed
alternately;
- If no errors occur during this cycle (see section 2), the following will appear in the
display;
K0
• Set the room thermostat to the desired room temperature.
The boiler will now automatically start operating.
xx software version;
xx parameter version;
stand-by mode
Remeha Avanta
62999-130711